Research on Fixed Capacity Modeling Method of Electric Vehicle Charging Stations For County Rural Grid
1 Shenyang Institute of Engineering, 18 Puchang Road, Shenyang, Liaoning, CHINA 110136
2 Liaoning Electric Power Research Institute, 39 Siping Street, Shenyang, Liaoning, CHINA 110006
3 State Grid Jibei Electric Power Co., Ltd. Chengde Power Supply Company, No.10 Xinhua Road North, Chengde, Hebei, CHINA 067400
* Corresponding author: 15502438240@163.com
To vigorously promote the development of electric vehicles in rural areas, it is necessary to scientifically and reasonably plan and arrange the location and capacity of electric vehicle charging facilities. This article focuses on the site selection and capacity determination of electric vehicle charging stations for county-level rural power grids. An optimization model was established with the total annual cost of the entire society as the comprehensive objective function, taking into account constraints such as power flow constraints, node voltage constraints, and the number of charging stations. A simulation analysis was conducted on a newly planned area of a county power grid to verify the rationality and feasibility of the proposed model and solution method.
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.