The Research of the Project Proprietor’ s Management Control of Engineering Change
Economic Management Institute of Jiangsu Science and Technology University, Zhenjiang, Jiangsu, China
The problem of the engineering budgetary estimate surpass engineering cost estimate, engineering budget surpass engineering budgetary estimate, engineering final accounts surpass engineering budget in our country’s present stage of the engineering construction process is widespread, and the reason most due to engineering change. By reference to relevant case analysis, the study found the changing factors that induced engineering change largely are the proprietors’ poor management of engineering change. Due to the different management methods of the different project stakeholders, this article will take the proprietors’ point of view, relying on engineering change process, according to the characteristics of the construction project, reference to the project management concept, sums up the proprietor’s management processes and methods. Then they can make manage and control in organize engineering change process and appraisal, then improve their management capacity of engineering change.
Key words: proprietor / engineering change / project management
© Owned by the authors, published by EDP Sciences, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 2.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.