Issue |
SHS Web Conf.
Volume 35, 2017
3rd International Conference on Industrial Engineering (ICIE-2017)
|
|
---|---|---|
Article Number | 01056 | |
Number of page(s) | 4 | |
Section | Sustainable Development of Industrial Enterprises | |
DOI | https://doi.org/10.1051/shsconf/20173501056 | |
Published online | 26 June 2017 |
Specifics of multi-project management: interaction and resources constraints
Peter the Great Saint-Petersburg Polytechnic University, Saint-Petersburg, Russia
* Corresponding author: nadezhdaat@gmail.com
Multi-project management is fundamentally different from the control of a particular project or a set of slightly interconnected projects in terms of complexity and specifics. In multiproject management of the company production it is important to analyze the innovation interaction and its impact on the commercialization stage. A multiparameter factor of innovations interaction was introduced. The optimization problem which considers this factor was mathematically defined. The solution of this problem produces a schedule of innovations launches. This problem definition allows updating the objective function that corresponds to the aims of a manufacturing company. For example, it can help maximize the number of interdependent innovations with restrictions to current tangible and intangible resources or minimize the number of used tangible resources at a fixed number of innovations implemented. In order to verify the optimization problem an evolutionary approach based on genetic algorithm and local search is used. The verification was performed by the Solver a Microsoft Excel add-in. The readiness for practical use of the proposed solution was proved by the experiment.
© Owned by the authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.