Issue |
SHS Web Conf.
Volume 35, 2017
3rd International Conference on Industrial Engineering (ICIE-2017)
|
|
---|---|---|
Article Number | 01102 | |
Number of page(s) | 5 | |
Section | Sustainable Development of Industrial Enterprises | |
DOI | https://doi.org/10.1051/shsconf/20173501102 | |
Published online | 26 June 2017 |
Evaluating of innovative projects’ effectiveness at industrial enterprises
Production Management, Kazan Federal University, Naberezhnye Chelny Institute, Kazan, Russia
* Corresponding author: aidarp@mail.ru
The problem of assessing of innovative projects’ effectiveness in industry from the perspective of integrated and compromise approach is actualized. Taking into consideration main directions of the Russian economy development the tooling of efficiency estimation of innovative projects is offered. Evaluating of the effectiveness is presented as solution of multi-criteria optimization problem (using the theory of fuzzy sets and theory of aggregation). The complex of efficiency measurement parameters is developed, which consists of group of critical parameters and economic parameters. Also we offer the mathematical apparatus of innovative projects’ efficiency evaluation. The technique, the sequence in the process of evaluating of innovative projects’ effectiveness in the industrial enterprises are described in present work.
© Owned by the authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.