Obstacles to the Development of BIM in China's Prefabricated Construction: A Decision-making Test and Evaluation Laboratory (DEMATEL) Model
1 College of Architecture and Urban-Rural Planning, Sichuan Agricultural University, Dujiangyan Sichuan, 611830, China
* Corresponding author: swydong@sicau.edu.cn
With the continuous progress of the time, technology is also developing rapidly, among which Building Information Modeling (BIM) has also become a hot topic in prefabricated constructions. Previous research has made it clear that BIM can promote the development of prefabricated construction. However, in practical applications, BIM technology has not been well developed in prefabricated construction. In order to find out the obstacles to the development of BIM technology in China's prefabricated construction, and identify the relationship between obstacles, this study identified 20 obstacles through literature review. This study used the Decision-making Test and Evaluation Laboratory (DEMATEL) model to get the importance of each obstacle and the causality between them, and provides a solution to the development of BIM technology in China to promote the development of BIM technology in new construction methods.
Key words: BIM / Prefabricated construction / Obstacles
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.