Issue |
SHS Web of Conf.
Volume 166, 2023
2022 International Conference on Education Innovation and Modern Management (EIMM 2022)
|
|
---|---|---|
Article Number | 01016 | |
Number of page(s) | 6 | |
DOI | https://doi.org/10.1051/shsconf/202316601016 | |
Published online | 05 May 2023 |
Distribution rules of conflict events and management countermeasures of large-scale construction engineering projects
1 Economy and Management Department, North China Electric Power University, 102206 Beijing, China
2 School of Construction Management Technology, Purdue University, 47907 West Lafayette, IN, USA
3 School of Economy and Management, North China Electric Power University, 102206 Beijing, China
* Corresponding author: hou-xl@163.com
The processes of large-scale construction projects implementation are often affected with various internal and external factors, which result in various conflict events in different stages of the project, and bring different degrees of harm to the construction project. In order to understand and master the distribution rules of various conflict events in different stages in large-scale construction projects, a massive investigation was carried out on 96 large-scale engineering construction units in China, and 325 effective research samples were obtained. Based on this investigation results, the mathematical analysis and summary of the conflict events of large construction engineering projects have been made by multiple statistical analyses, which reveal the distribution law and the primary and secondary relationship of various conflict events in each stage of engineering projects. Combined with the research results, the management countermeasures and suggestions of conflict events are put forward, which provide valuable references for the project managers to effectively manage the conflict events and improve the management level of engineering projects.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.