Issue |
SHS Web of Conf.
Volume 44, 2018
IV International Scientific Conference “The Convergence of Digital and Physical Worlds: Technological, Economic and Social Challenges” (CC-TESC2018)
|
|
---|---|---|
Article Number | 00073 | |
Number of page(s) | 10 | |
DOI | https://doi.org/10.1051/shsconf/20184400073 | |
Published online | 05 June 2018 |
A digital method for correcting planned electric energy consumption as a step to the Energynet market
Peter the Great Saint Petersburg Polytechnic University, 195251 Polytechnicheskaya st. 29, Russian Federation
* Corresponding author: zenit-che@mail.ru
Creating the modern high-tech industry should be viewed as a fusion of material and digital production and control methods. Industrial enterprises with uneven electric energy consumption, which have failed to adapt to the requirements of modern digital wholesale electricity market, have to spend significant money to pay for hourly deviations of electric energy, whose price constantly grows. A digital method for correcting planned electric energy consumption based on the theory of games is offered to reduce the costs of these enterprises, which have no possibility for regulating own load on a real time basis. The updating is carried out depending on hourly relations of prices on the wholesale electric energy market in order to exclude the risks of making unprofitable hourly transactions. An algorithm of the proposed method is provided and a predictive model developed on its basis is described and positive results of its testing on the basis of a metallurgical enterprise.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.