Issue |
SHS Web Conf.
Volume 35, 2017
3rd International Conference on Industrial Engineering (ICIE-2017)
|
|
---|---|---|
Article Number | 01028 | |
Number of page(s) | 6 | |
Section | Sustainable Development of Industrial Enterprises | |
DOI | https://doi.org/10.1051/shsconf/20173501028 | |
Published online | 26 June 2017 |
Analysis of alternative actions for import substitution policy implementation in machine engineering complex
1 Southwest State University, 305040 Kursk, Russia
2 Kursk Institute of the Cooperation, 305000 Kursk, Russia
* Corresponding authors: tschsa@yandex.ru
This paper discusses the considerations for production modernization, replacement of imported spare parts manufactured in-house and redistribution of items manufactured spare parts between managed societies, with a goal to improve the quality and reliability of products, to reduce its cost, and work. Noted that the process of acquiring new foreign equipment and modern materials are complicated. There are examples of restrictive measures of the sanctions impact on industrial products and the dynamics of dependency on imports of industrial products. We used analytic and statistical research methods. Authors conducted a comparative analysis of the engineering assets of «Metalloinvest» holding that showed that all businesses have an impressive fleet of metal-working equipment on all groups of machines on the basis of an analysis of the needs for them to transport spare parts.
© Owned by the authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.