Issue |
SHS Web Conf.
Volume 35, 2017
3rd International Conference on Industrial Engineering (ICIE-2017)
|
|
---|---|---|
Article Number | 01147 | |
Number of page(s) | 6 | |
Section | Sustainable Development of Industrial Enterprises | |
DOI | https://doi.org/10.1051/shsconf/20173501147 | |
Published online | 26 June 2017 |
Construction and assembly works planning: optimization or search for solutions
South Ural State University, Chelyabinsk, Russia
* Corresponding author: gusevev@susu.ru
The article analyzes the instability causes of construction and assembly works (CAW) schedules which leads to the construction works and logistics instability. The “nature” of multi-variant management solutions is considered. The contradiction of requirements to the basic organizational and technological model (OTM) to solve scheduling problems of CAW and construction works is revealed. The basic “an object construction technology model” as “an object techno-logical dependencies models” is considered. A new approach is proposed to solve the problem of CAW scheduling, which includes two-step managerial decisions development at the CAW planning stage and construction works organization stage. At the first stage, the problem is reduced to finding a solution (and not to determining an optimal variant). At the second stage, the problem is solved through optimization.
© Owned by the authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.