Open Access
Issue
SHS Web Conf.
Volume 49, 2018
International Cooperation for Education about Standardization 2018 (ICES 2018) Conference Joint International Conference with 5th ACISE (Annual Conference on Industrial and System Engineering) and World Standard Cooperation Academic Day
Article Number 02020
Number of page(s) 10
Section Engineering
DOI https://doi.org/10.1051/shsconf/20184902020
Published online 02 October 2018
  1. Taufik, H.A.R.M, Pengelolaan Risiko Kualitas pada Tahap Pelaksanaan Konstruksi di Lingkungan PT. X, Tesis Universitas Indonesia, Indonesia, (2010) [Google Scholar]
  2. Choudhry, R.M., and Aslam, M.A., Risk Analysis of Bridge Construction Projects in Pakistan, Proceedings of International Council for Research and Innovation in Building and Construction (CIB) Working Commission W99. Purdue University, (2011) [Google Scholar]
  3. Dziadosz, A., and Rejment, M, Risk Analysis in Construction Project – Chosen Methods, Procedia Engineering 122, pp: 258–265, (2015) [Google Scholar]
  4. C.S. Pawar, S.S. Jain, J.R. Patil, IJIRAE, 2, 172–176, (2015) [Google Scholar]
  5. A. Nurdiana, M.A. Wibowo, J.U.D. Hatmoko, Procedia Engineering, 125, 12–17 (2015) [CrossRef] [Google Scholar]
  6. International Standard, ISO 13000, (2009) [Google Scholar]
  7. D. Hillson, Proceeding of, The Project Management Institute Annual Seminars & Symposium, (2002) [Google Scholar]
  8. Asmarantaka, N.S., Analisis Resiko yang Berpengaruh Terhadap Kinerja Proyek pada Pembangunan Hotel Batiqa Palembang, Jurnal Teknik Sipil dan Lingkungan, Vol. 2, no. 3, pp. 483–491 A. Dziadosz, M. Rejment, Procedia Engineering, 122, 258–265 (2015) [Google Scholar]
  9. Winaktu, G., Mulyadi, L., and Hargono, E., Penentuan Skala Prioritas Risiko pada Pembangunan Jembatan Afiat Desa Kanigoro Kecamatan Pagelaran Kabupaten Malang, Jurnal Info Manajemen Proyek, pp. 11–19 (2014) [Google Scholar]
  10. Vidivelli, B., Vidhyasagar, E., and Jayasudha, K, Risk Analysis in Bridge Construction Projects, International Journal of Innovative Research in Science, Engineering and Technology, Vol. 6 no. 5, pp 8271–8284 (2017) [Google Scholar]
  11. Zou, P.X.W., Zhang, G., and Wang, J.Y, Indentifying Key Risk in Construction Projects: Life Cycle and Stakeholder Perspectives, Proceedings of the 12th Pacific Rim Real Estate Society Conference, Auckland, New Zealand, (2006) [Google Scholar]
  12. Project Management Institute, A Guide to the Project Management Body of Knowledge, Fifth Edition PMBOK. Project Management Institute, Inc. Pennsylvania, (2013) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.