Open Access
Issue
SHS Web Conf.
Volume 200, 2024
2024 International Conference on Sustainable Economy and Social Sciences (SESS 2024)
Article Number 02028
Number of page(s) 6
Section Social Development
DOI https://doi.org/10.1051/shsconf/202420002028
Published online 31 October 2024
  1. Kumar, Hemanth, and SP Sreenivas Padala. “A BIM-integrated multi objective optimization model for sustainable building construction management.” Construction Innovation ahead-of-print (2024). [Google Scholar]
  2. Dasović, Borna, Mario Galić, and Uroš Klanšek. “A survey on integration of optimization and project management tools for sustainable construction scheduling.” Sustainability 12.8 (2020): 3405. [CrossRef] [Google Scholar]
  3. Afzal, Muhammad, et al. “Towards BIM-based sustainable structural design optimization: a systematic review and industry perspective.” Sustainability 15.20 (2023): 15117. [CrossRef] [Google Scholar]
  4. do Carmo, Cristiano Saad Travassos, and Elisa Dominguez Sotelino. “A framework for architecture and structural engineering collaboration in BIM projects through structural optimization.” J. Inf. Technol. Constr. 27 (2022): 223-239. [Google Scholar]
  5. Guo, Kai, and Limao Zhang. “Multi-objective optimization for improved project management: Current status and future directions.” Automation in Construction 139 (2022): 104256. [CrossRef] [Google Scholar]
  6. Ghaffarianhoseini A, Tookey J, Ghaffarianhoseini A, et al. Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges[J]. Renewable and sustainable energy reviews, 2017, 75: 1046-1053. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.