L’application de l’ingénierie de collaboration sur le projet architectural - Phase projet d’exécution
The Application of Collaborative Engineering in the Architectural Project - Execution Phase
1 Doctorante, LIFAM-IRIT, ENSA Montpellier, 179 rue de l’Esperou, F-34093 Montpellier Cedex 5, France
2 Pr, EVCAU, École nationale supérieure d’architecture de Paris Val-de-Seine, 3 quai Panhard et Levassor 75013 PARIS, France
3 MCF, IRIT, 2 rue Charles Camichel 31071 Toulouse Cedex 7, France
Tout au long du processus d’un projet architectural BIM, de sa conception jusqu’à sa démolition, divers acteurs interviennent, chacun apportant ses compétences et son expertise spécifiques pour contribuer à sa réalisation. La collaboration et la coopération entre ces parties prenantes revêtent une importance cruciale pour garantir le succès global du projet. Cet article propose l’application d’une méthode d’ingénierie de la collaboration à une phase particulière du projet architectural BIM, visant à favoriser une communication fluide et une collaboration efficace entre les intervenants. Cette étude se focalise sur l’identification des activités collectives entre les différents acteurs de la construction, mettant particulièrement l’accent sur l’aspect pratique du Building Information Modeling (BIM), notamment sur la collaboration autour de la Maquette numérique BIM au sein des agences lors de la phase de projet d’exécution.
Abstract
Throughout the process of a BIM architectural project, from its conception to its demolition, various stakeholders are involved, each of them bringing their own specific skills and expertise to contribute to its realisation. Collaboration and cooperation between these stakeholders are crucial to the overall success of the project. This article proposes the application of a collaborative engineering method to a particular phase of the BIM architectural project, with the aim of fostering fluid communication and effective collaboration between the stakeholders. This study focuses on the identification of collective activities between the various construction stakeholders, with particular emphasis on the practical aspect of Building Information Modelling (BIM), and in particular on collaboration around the BIM digital model within agencies during the execution project phase.
Mots clés : Acteurs de la construction / Activité collaborative / BIM / Ingénierie de la collaboration
Key words: BIM / Collaborative activity / Collaborative engineering / Construction industry stakeholders
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.