Open Access
Issue
SHS Web Conf.
Volume 47, 2018
SCAN’18 – 8e Séminaire de Conception Architecturale Numérique
Article Number 01008
Number of page(s) 10
Section Actes de la conférence SCAN’18
DOI https://doi.org/10.1051/shsconf/20184701008
Published online 23 October 2018
  1. Beck, K. et al., (2001). Manifesto for agile software development. http://agilemanifesto.org [Google Scholar]
  2. Cohn, M. (2005). Agile Estimating and Planning. Prentice Hall; 1ère édition. ISBN-13: 978-0131479418. [Google Scholar]
  3. Dupin, P., (2014). Le LEAN appliqué à la construction: Comment optimiser la gestion de projet et réduire coûts et délais dans le bâtiment? Éditeur: Eyrolles. [Google Scholar]
  4. Gless, H.-J. and al., (2017). BIM-agile practices experiments in architectural design. In: Luo Y. (eds) Cooperative Design, Visualization, and Engineering. CDVE 2017. Lecture Notes in Computer Science, vol 10451, pp. 135-142. Springer, Cham. [Google Scholar]
  5. Hochscheid, E. et al., (2016). Intégration de pratiques BIM en agences. SCAN’16 Toulouse. Presses Universitaires Nancy. [Google Scholar]
  6. Kensek, K. et al., (2015). Manuel BIM: Théories et Applications. Eyrolles. [Google Scholar]
  7. Sakikhales, M., (2017). Using Agile Project Management and BIM for Improved Building Performance. BIM, Building Performance, Design and Smart Construction Projects. doi: 10.1007/978-3-319-50346-2_5. [Google Scholar]
  8. Womack, J., Jones, D., (2003). Lean Thinking: Banish Waste and Create Wealth in Your Corporation, Revised and Updated. Éditeur: Free Press; Édition: 2 (10 juin 2003) ISBN 978-0743249270. [Google Scholar]
  9. Zignale, D. and al., (2011). Modelling practices and usages to improve adaptation of group-ware-tool services: Application in the AEC sector. EuropIA.13: 13th International Conference on Advances in Design Sciences and Technology. Roma, Italy. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.