Open Access
Issue
SHS Web Conf.
Volume 82, 2020
SCAN’20 - 9e Séminaire de Conception Architecturale Numérique
Article Number 01001
Number of page(s) 9
Section Retour vers le futur : Evolution des outils et des pratiques
DOI https://doi.org/10.1051/shsconf/20208201001
Published online 09 November 2020
  1. Aziz, N.D., Nawawi, A.H. and Ariff, N.R.M. (2016) ‘Building Information Modelling (BIM) in Facilities Management: Opportunities to be Considered by Facility Managers’, Procedia - Social and Behavioral Sciences. doi: 10.1016/j.sbspro.2016.10.252. [Google Scholar]
  2. Celnik, O. and Lebègue, E. (2015) BIM et maquette numérique: pour l’architecture, le bâtiment et la construction. Deuxième. Edited by Eyrolles. [Google Scholar]
  3. Chabard, P. (2010) ‘Antoine Picon. Culture numérique et architecture : une introduction’, Critique d’art. Actualité internationale de la littérature critique sur l’art contemporain. [Google Scholar]
  4. Charef, R. et al. (2019) ‘Building Information Modelling adoption in the European Union: An overview’, Journal of Building Engineering. doi: 10.1016/j.jobe.2019.100777. [Google Scholar]
  5. D’Alfonso, E. and Samsa, D. (2002) L’architecture, les formes et les styles de l’Antiquité à nos jours. Edited by Solar (2000). [Google Scholar]
  6. EU BIM Task Group (2017) Handbook for the introduction of Building Information Modelling by the European Public Sector Strategic action for construction sector performance: driving value, innovation and growth, EUBIM Task Group. [Google Scholar]
  7. Gobbo, E. (2014) Déchets de construction, matières à conception. Analyse des stocks et flux de matières dans le cadre des opérations de rénovation énergétique en Région de Bruxelles-Capitale. Université Catholique de Louvain UCL. [Google Scholar]
  8. Halbach, A. and Jancart, S. (2019) ‘BUILDING FOR RESOURCE RECOVERY THROUGH BIM, Interviews with practicing architects’, Responsive Cities, disrupting through circular design, IAAC, pp. 1-8. [Google Scholar]
  9. Hochscheid, E. and Halin, G. (2018a) ‘BIM implementation in architecture firms : interviews, case studies and action research used to build a method that facilitates implementation of BIM implementation of BIM’, eCAADe 2018 36th Annual Conference. [Google Scholar]
  10. Hochscheid, É. and Halin, G. (2018b) ‘L’adoption du BIM dans les agences d’architecture en France’, SHS Web of Conferences. doi: 10.1051/shsconf/20184701009. [Google Scholar]
  11. Krygiel, E. and Nies, B. (2008) Green BIM : Successful sustainable design with building information modeling, Indianalolis: Wiley Publishing, IN. [Google Scholar]
  12. MacLeamy, P. 2004. MacLeamy curve, in Collaboration, Integrated Information, and the Project Lifecycle in Building Design and Construction and Operation (WP-1202). CURT, August, 2004 [Google Scholar]
  13. Rasmussen, M.B., Gade, A.N. and Jensen, R.L. (2017) ‘A Knotworking Guideline for Building Projects: Bridging the Gap between Participants’, International Journal of Engineering Research and Applications. doi: 10.9790/9622-0706042440. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.